Full of "black technology"! Technical highlights of Shenzhen Rail Transit Line 12
编辑:2022-11-08 17:28:00
Latest news of Shenzhen Rail Transit Line 12
At present, the line has successively completed a number of inspections
It will enter the safety assessment before initial operation!
Let's decrypt
See what "black technology" it uses
Multi link application of BIM technology
Information management makes the project speed up accurately
BIM technology refers to the building model established on the basis of various relevant information data of the construction project, which simulates the real information of the building through digital information simulation. The application of this technology is of great significance to effectively improve the engineering efficiency, save construction costs, reduce engineering pollution and other fields.
In order to further explore the urban rail transit project
Digital twin value
Accelerate the construction of smart subway
Shenzhen Metro has been vigorously promoted in recent years
BIM application of urban rail transit project
eighty-five thousand five hundred and eighty-eight
BIM deepening design
Construction of Metro Line 12 in the chiller room
Routine mechanical and electrical installation, station construction and other links
All fully apply BIM technology
It has realized the
Management standardization, informatization, process and refinement
Carry out assembly construction in multiple directions
Innovative technology helps improve project quality and efficiency
Metro Line 12 is under construction
Fully implement the concept of green construction
Strive to create a
Shenzhen Demonstration Assembled Innovation Line
Compared with traditional cast-in-situ construction method
Prefabrication of prefabricated components
Cooperate with on-site assembly
Greatly shorten the construction period
one hundred and eleven thousand one hundred and forty-nine
Fabricated prefabricated track slab
The 7 chiller rooms of Metro Line 12 are all constructed by assembly. Through the batch prefabrication of pipe sections in the factory, the "zero welding" of the on-site project is realized. The overall construction is completed in one go, which effectively improves the installation quality, improves the on-site operation efficiency, and greatly reduces the construction period.
The prefabricated slab track bed technology applied in the line and the assembly and allocation of water chiller, specifically, the prefabricated track slab adopts standardized design, factory production and mechanized construction, which significantly improves the overall construction quality.
Not only that, the prefabricated slab track bed technology makes the construction organization more flexible, and can carry out synchronous construction on multiple working faces to effectively ensure the track laying period. With the help of precision measurement and track fine adjustment technology, the track laying accuracy is better, the train operation is more stable, and the passenger experience is more comfortable.
Equipped with high-level train control and security system
Intelligent operation and maintenance, high efficiency, enabling urban commuting
The train of Metro Line 12 adopts GOA4 level automatic driverless system, with a design speed of 80 km/h, and has the functions of automatic operation, autonomous decision-making, fault self-healing, and timely event handling.
Shenzhen Metro Phase IV Project
There are 4 new lines
Equipped with automatic driverless system
With Metro Line 12 and other lines put into operation
Digital transformation of Shenzhen rail transit will continue to accelerate
69c27577216f71eccd9834c87dce6b59.jpeg
Haihai Tianyuan South Station
At the same time, Shenzhen Metro is also building a multi integrated and intelligent security system. The system adopts open architecture and advanced system integration technology, and cooperates with 4K ultra-high definition monitoring, electronic access control, visual help interphone, emergency alarm button, intrusion alarm device and other security inspection facilities to jointly protect the safe operation of Line 12.
Add Facebook intercommunication and AI digital employee customer service
Continuous innovation of AFC system
The AFC system of Metro Line 12 will be connected to the Shenzhen Rail Transit Clearing Center System (ACC Phase II) and Shenzhen Metro Multi line Centralized Management System (CLC Phase II) constructed at the same time. On the basis of supporting two-dimensional code, each station also has the function of "face brushing" and free group "hand brushing".
5fd3508e600263480cc066ef243d2a6b.jpeg
Smart customer service center
At the same time, each station of Shenzhen Metro Line 12 will be equipped with an integrated open and closed intelligent customer service center, and will provide audio and video interactive services to passengers using AI digital employee customer service developed by Shenzhen Metro.
ad39f516b3250e00172b0a39f8f321a0.jpeg
Entrance gate
Metro Line 12 enables transportation with technology
Realizing the design and construction suitability
Efficient energy structure
Healthy environmental protection
Intelligent operation and maintenance
Further upgrading of humanized supporting facilities
COMPANY MENU
CONTACT US
Contact: Manager Cao
Tel.: 15,935,611,105 Fixed telephone: 0351-3,592,096 (fax)
Email: caoxingli@cgforge.cn
Address: Hougou Road, Xindian Street, Taiyuan, Shanxi
Record No.: JICPB No. 13001414-2
COMPANY MENU
CONTACT US
Contact: Manager Cao
Tel.: 15,935,611,105 Fixed telephone: 0351-3,592,096 (fax)
Email: caoxingli@cgforge.cn
Address: Hougou Road, Xindian Street, Taiyuan, Shanxi
Record No.: JICPB No. 13001414-2